Wednesday, 30 December 2015

First Xmas and storm Frank









Wednesday, 23 December 2015

December and a little frost

We are still warm inside though.
The Front
The block work wall is yet to be rendered, but when the weather is better.

The majority of the Stone Building is still to be tackled.
You can see Ross Bay, where we used to stay,  in the distance 


The view from the back garden.

Nov - Photos of the main parts of the house

 
The master bedroom suite on the ground floor of the brick building is currently being used as a lounge until we finish the stone building
(2-3yrs)
Similarly the utility room is the temporary kitchen.
 
The hallway has become a great multi-purpose space with the kitchen and the rest of the brick building at one end and the doorway to what will be the stone building section at the other. The office and boot room also feed off of the hall.
 
Note the old electrical power switch for the saw mill is now the letter box.



 Bathroom with bath and separate walk in shower.




You can still see scaffolding for Phase 2 through the window





The View from another window Room for a small boy.


The Guest room is temporarily being used as the main bedroom, so we are making do without wardrobes for now


Aug/Sept views and area around

View from bedroom window (neighbours house can be seen on TV)
View from upstairs bedroom
The front of the house (faces East)

House from the North
House from field on North side of burn - note the stone building is still to be completed.
 

July/Aug - starting to unpack




The Hall way.

 The temporary lounge


 Fraser's Room.
 Walk in shower.
 Rest of bathroom