Tuesday, 21 February 2012

Feb 2012

The upstairs floor is now back in  and some stud work is starting to go in.





 This will be my hallway. The window is to be replaced with a door.

Monday, 6 February 2012

We've lost a floor

The upstairs floor is being moved up a bit and needs to be replaced in places. The old one is stripped out and ready for the block work.


We have a floor!


The downstairs floor in the brick building went in just before the cold weather arrived. Hurrah! It looks bigger now too.